History
product -
Wire Rope
the business that
continues to bear his
name in Sydney in 1921.
really started focusing on supporting Australian
mining, construction and manufacturing sectors.
1 Sep 1939 – 2 Sep 1945
first thirty years of its life, the Reid™ business
was well placed to profit from the opportunities
presented by Australia’s spectacular growth in
the period since 1945. In the 1940’s Reids focus
on concrete construction was clear.
of choice
- Concrete & Steel
population cracks the
10,000,000 mark!
AUS in 1964
wire strand products, Reid pioneered the
introduction of pre-stressed concrete in
Australia during the 1960s,
Clutch
Developed
in 1971.
with the Flat Lift Lifting System SwiftLift
Foot Anchor and Clutch.
Foot Anchors
in the early 90’s in NZ with various
system accessories added throughout
the decade, including, inserts, couplers
and flange nuts. Genuine ReidBar is
introduced to the AUS Market in 1995.
Grout Sleeve
3Dx™ Edge lifting
system was
developed in 2013
range of products, including ReidBrace,
OrbiPlate, Edge Lifting Anchors and
Hairpin Anchors for the ANZ market.
Anchor ELA
technology and engineering solutions provide
new opportunities to build faster, safer, and more
efficiently, and driven by a passion for innovation,
Reid are gearing up for exciting enhancements
in concrete lifting and construction, developed in
conjunction with the market.